Prevailing Wage Drywall and Metal Framing in St. Louis: What GCs Need From a Sub
Public projects in Missouri, such as school additions, state facility renovations and municipal buildings, usually carry prevailing wage requirements and more paperwork than private work. For a GC, the drywall and framing sub has to price the work correctly and keep up with the documentation. We bid prevailing wage interior packages across Greater St. Louis.
What changes on a prevailing wage job
Labor is priced at the rates in the project's wage determination for each trade classification
Payroll records are kept for every worker on the job and submitted in the format the agency or GC requires
Bid documents often add requirements such as bonds, insurance limits, schedules of values and closeout paperwork
Owners' reps tend to be stricter about submittals, inspections and finish quality
Reading the full bid package
On public work the drawings are only part of the scope. Division 01, the specification sections for gypsum board assemblies and non-structural metal framing, fire-rated assembly listings and every addendum affect the price. We price from the full set and list clarifications and exclusions clearly so the bid can be compared side by side. See fire-rated drywall requirements and drywall finish levels for two items that often drive cost.
Scope we bid on public projects
Selective demolition of existing interiors
Metal stud framing, including fire-rated assemblies where specified
Drywall hang, tape and finish
Interior painting
Rough and finish carpentry within our scope
Send the bid documents
Send the plan room link, spec book and bid date through our bid request form, or email Stldrywallpros@gmail.com. Projects start at $20,000.

Comments